INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

pressure fabrication shop design

pressure fabrication shop design

pressure fabrication shop design

(OP)
When designing a PV fabrication shop, what should be considered? We are intend to fabricate both SS and CS vessel. Should the SS workshop be completely isolated from CS one? What is the requirement of NDE section?
 

RE: pressure fabrication shop design

no requirement but contamination exist, if you have a chance of separating will be great to get cleanesness.
my fab shop does not require separation but there we are covering materials and jobs to avoid contamination.
consult your NDE service for further advise.

RE: pressure fabrication shop design

cmsmeng;
Are you designing a PV fabrication shop from scratch or re-modeling or designing a new facility for an existing shop? Understanding PV fabrication in terms of optimizing flow of work on critical pieces of equipment is critical to avoid bottlenecks. Understanding welding needs, material inventory, equipment storage, heat treating (in-house), office space, crane capacity...... the list goes on.

Nondestructive Examination (NDE) can be outsourced or in-house. The biggest effect for NDE is to decide if you want to have radiographic testing capability in-house. This is a financial decision.

I would segregate stainless steel fabrication from carbon and low alloy steel PV fabrication to avoid material mix-up and cross contamination problems with welding/cleaning.

RE: pressure fabrication shop design

A consideration for the future- beyond CS and SS: My previous company also did a study of welding more 'exotic' metals, e.g. titanium, tantulum, etc. For this you need a cleam room design, and we did have some priblems locating a space for it. But it was a no go due to low volume of jobs, unfortunately.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources