INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pile freeze

Pile freeze

Pile freeze

(OP)
I am being told by the geotech engineer for a deep foundation project that by driving reaction piles near a driven test pile (that has been assumed to have experienced freeze over 2+ weeks) that the freeze was broken by driving these reaction piles thus causing the test pile to fail during the static load test. Does this make sense?

RE: Pile freeze

How long after driving the reaction piles was the load test performed?  If it was a short time, it is possible that pore pressures had not dissipated and the test pile was affected.

In clay soils, I have also experienced a phenomenon in which the adjoining piles heave up the test pile.  This is especially true for displacement piles such as pipe piles.

RE: Pile freeze

(OP)
We are using a montube pile which is a fluted pile. The load test was performed three days after the reaction piles were driven.

RE: Pile freeze

It is possible that the capacity of the test pile was influenced by driving the reaction piles.  The only way to know for sure is to do another load test.

RE: Pile freeze

I agree that driving the reaction piles could affect the test pile capacity (i.e. cancel pore pressure dissapation already completed, cause test pile heave/movement).  The amount of capacity reduction would definately depend on the soil type.  It's usually best to install the reaction piles and test pile at the same time.  All piles can then set-up together.

RE: Pile freeze

(OP)
Thanks all....as a result we are driving the additional test piles at the same time as the reaction piles to avoid this issue.

RE: Pile freeze

You may also want to install the test pile last to reduce heave issues.

RE: Pile freeze

You should be able to let the pile set and retest the pile rather than drive new piles and build a new load test. I would also check your load test set up and data to eliminate any other causes. If you do drive new piles I would moniter with a PDA to et a preliminary result.

RE: Pile freeze

If you re-use the existing piles, I would recommend retapping them.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources