INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Plant Analysis

Plant Analysis

Plant Analysis

(OP)
Hello to all. This is the first time I post on this forum. I need some guidance on a few things since my engineering degrees aren't in the Industrial area.

1. In a plastic processing plant (injection, blow molding and extrusion) we have some indexes that are supposed to show us the performance of the plant, mainly: times, parts produced, efficiency, availability, energy consumption efficiency, etc. I have done many studies on sugar mill analysis from energy and mass analysis and balances to exergy analysis but I have to be honest, I have no experience on a process that can be counted as units produced, for instance. From my point of view we lack of good and reliable indexes. If someone could please tell me what indexes should I have in order to have the plant's performance well described, I'd be more than greatfull.

2. In electrical engineering, there is a thing called per unit value (p.u.) that helps us to better calculate things. This is a percentage value and has a common base (like nominal voltage and amperage) so when we need to make a calculation whe need to first transform our real value into a p.u. one and then calculate (if the voltage value is 90 and the base is 110, the p.u. value is 90/110, in decimals). Now, if I have lets say 4 indexes that multiplied they give me an overall index (lets call this general plant performance) and of those I have 3 high values and one low, the low one will affect seriously my final outcome. For me this is a way to punish other indexes because one is not ok. I see it like this, and please correct me if I am wrong: lets transform each index into a common base and we multiply each one to obtain an overall one. The base could be, for instance, the goal pursued for each index in a certain period of time.

3. I could really use some good links or books to stuff like this, so please let me know of some I could go to.  =)

I thank you all in advance for your interest and for taking time to read this. You can contact me directly to the email address I provide in my signature if you wish.

Thanks to all again,

Regards,



Manuel A. Escamilla
Plant Supervisor
Inyectores de Plástico, S.A.
www.grupoindustrialeec.com.gt

RE: Plant Analysis

Manuel, there are many good reference books that give systems to measure operational performance and specific features, I would start with the Industrial Engineering Handbook or a book on Activity Based Costing.

Basic measures are the best when getting started in this type of assessment.  The reason why these measures are key is because they can be the basis for cost control and estimation of the total process from materials, equipment, labor and plant overhead costs.

Some of the basic measures are:
Setup Time: the time to get the machine operational for a specific job
Cycle time: the time to make one part
Material utilization: amount of matertial to make one part all allowances included
Cost of expendables: the cost for all of the wear items - tools, coolant, molds, filters, etc -  it takes to run the job.

You get the basic idea.  If you are running multiple plants and/or have some industry standard measurement you should use that as a way to do comparitive analysis.

Lastly, it is the sum total of the measurements that counts, in that, it is no good to have great (fast) cycle time but yet have poor material utilization.  So you as plant manager need to come up with a set of metrics that define you process but are not overly complex or numerious in scope.  I worked for a VP of operations that had 25 plant metrics that he reviewed each week.  I thought that this was way too much to focus on.

Good Luck!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources