×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

CHILLER CARRIER, BEFORE/WATER, AFTER/GLYCOL

CHILLER CARRIER, BEFORE/WATER, AFTER/GLYCOL

CHILLER CARRIER, BEFORE/WATER, AFTER/GLYCOL

(OP)
I have a chiller Carrier 30GTN210. AT THE MOMENT WORK COOLING WATER. BUT I WANT to PASS IT so that  WORK COOLING GLYCOL FOR TERMOACUMULACION. I have READ IN THE MANUAL THAT I should BUY THE module EMM to PROGRAM THEIR CYCLES OF WORK. IT ALSO SAY THAT I should CHANGE THE HOLE OF THE ELECTRONIC EXPANSION VALVE.  

IF I CHANGE THE HOLE HOW OBTAIN SEVERAL SETTINGS??

RE: CHILLER CARRIER, BEFORE/WATER, AFTER/GLYCOL

Easiest way out.  Talk to the local Carrier service guy.

HVAC68

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources