INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Effects of Increased quantity on cycle time

Effects of Increased quantity on cycle time

Effects of Increased quantity on cycle time

(OP)
I'm attempting to quantify the effect of multiple orders for the same product on cycle time.
As an example;
1st order is for 50 items and cycle time is 100hrs, if we are to complete for 3 additional orders of 50 items at the same time (4 individual orders of the same product for 4 different customers)
How will can I quantify the reduction in cycle time on each of the three additional orders?

Thanks in advance

RE: Effects of Increased quantity on cycle time

If I am understanding you correctly all you will save is the downtime involved in getting the machine, assembly line or whatever set up to produce a certain item.

RE: Effects of Increased quantity on cycle time

We separate downtime into downtime to start up a line and downtime to shut down a line.  In operations which are operator controlled, such as hand assembly,  we find that the time per part, not counting downtime, can decrease as the batch size increases.    

Thomas J. Walz
Carbide Processors, Inc.
www.carbideprocessors.com

RE: Effects of Increased quantity on cycle time

(OP)
Thank you for the replies,
We will save machine setup and change over time but,
I think I'm looking for the quantifiable portion to the machine downtime and the decrease in time per part,

Is there a formula to calculate the reduction based on parameters such as utilization, cycle time etc??

Thanks again

RE: Effects of Increased quantity on cycle time

Again I might be misunderstanding you but isn’t that just A + (B/N) ?

Where A is the time to produce a part, B is the time to set up and disassemble the machine/ production line and N is the number of components.

I am sure other factors come into play as Tom says time will decrease as operators “get in the swing”, I would however guess this reaches a point where fatigue, boredom or the need to use the rest room come in and the opposite is true.

RE: Effects of Increased quantity on cycle time


 ajack1

Yup, you're correct.  

We take all the time we pay for and divide it by all the parts we get.  This includes breaks, downtime, repairs, etc.  

My favorite has always been the boss, engineer, etc. who comes out; works like crazy for ten minutes to set "the standard" and then goes back to his office.   

To get meaningful answers we need many samples as changeover time varies as does everything else.  

I guess we use (A*N) + B/N

However I think yours is a better answer to the question as given.  We look at the question somewhat differently.  

Have good weekend,
Tom

Thomas J. Walz
Carbide Processors, Inc.
www.carbideprocessors.com

RE: Effects of Increased quantity on cycle time

JDK1,
In my experience there is X amount of time for set-up regardless of quantity.  Then there is an amount that varies according to product features.  If you can only fit 10 parts on a skid and your usual lot size is 50 then you need to include handling time for the four skids in your calculations.  OTH, if 30 fit on a skid you need to figure in two handlings even though one skid has only 20 pieces on it.  Sometimes refered to as "stepwise" incrementals.
I believe Maynard's Handbook covers some of this topic in better detail than we can here.  Locate a copy.
This is one reason that diferent companies approach your question somewhat differently.
Griffy

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources