INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Cold bolt preloading of Hot design temperature flanges

Cold bolt preloading of Hot design temperature flanges

Cold bolt preloading of Hot design temperature flanges

(OP)
When the equipment design temperature is very hot (e.p. > 350°C) is correct use, in the cold bolting operation, the same 50KSI standard preload value for B7 bolt type preview in ASME PCC-1?

When the equipment will be in temperature is correct think that the DL/L of bolt will remain the same value and the preload the same percent of RP0.2(t) at operation temperature?

For standard equipment with standard flanges and standard gasket (TEMA, ASME) can we be sure that is sufficent calculate the preload stress based on dimensions and material of bolt only or is always however necessary verify the gasket (seal and resistance) everytime?

tx Aldo Cigna

RE: Cold bolt preloading of Hot design temperature flanges

No, the standard preload value is not correct to use if joints will experience high temperatures that cause extra stresses due to thermal expansion.

The preload will not necessarily remain the same.

VDI 2230 covers temperature-dependent preload changes.

Regards,

Cory

Please see FAQ731-376 for tips on how to make the best use of Eng-Tips Fora.

RE: Cold bolt preloading of Hot design temperature flanges

(OP)
In the ipotesys that in operation the bolt temperature and flange temperature will be equal (e.p. heat insulated flanged joint)  i think that the bolt stretch will be the same value in cold and in operation condition but in this last case the stress for the same stretch will be inferior than in previous case (the stress curve will be lower)
The temperature automaticaly will unload the initial bolt preload
Is this correct?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources