INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Bolt torque on structural assemblies on the ground vs. in place.

Bolt torque on structural assemblies on the ground vs. in place.

Bolt torque on structural assemblies on the ground vs. in place.

(OP)
We are currently erecting structural steel that will hold refinery equipment and piping.  The contractor is putting sub-assemblies (beam-to-column connections and cross-bracing) together on the ground and performing a final torque.  These 10 ton sub-assemlies are then lifted into place and spliced together in the structure. After these sub-assemblies are lifted into place, will they have to re-torque these bolts?  In other words, has there ever been any case of bolt loosening from the crane erection process?  

RE: Bolt torque on structural assemblies on the ground vs. in place.

Montana1,

I think what your contractor is doing should be perfectly acceptable.  A couple of caveats though.

1)if any of the bolts are loaded in tension or in tension+shear, then make sure that the erection process (considering lifting points, any resulting cantilevers, etc will not result in any stress increases beyond what the bolts were designed for.  Also that the erection procedures don't put tensile loads on any bolts that they cannot handle.
2)  Not bolt related, but consider all member stresses resulting from the same erection conditions- make sure that no members are overstressed.  

That said, from your description, it sounds like the contractor is assembling bents lying on the ground and lifting or tilting them to the upright position.  I would not expect this to cause overstress in bolts or members.  A competent erector should be able to accomplish this without mishap, based on his/his crews'/his foremen's experience and "feel".  

I would expect more potential for problems with bent baseplates or anchor bolts tnan with the steel and high strength bolts themselves.

regards,


chichuck

RE: Bolt torque on structural assemblies on the ground vs. in place.

If properly tensioned on the ground (either snug or slip critical) and carefully hoisted into place, then it shouldn't be necessary to re-torque the bolts.

Dik

RE: Bolt torque on structural assemblies on the ground vs. in place.

Be careful about contractors who "torque" bolts. There are different requirements for structural bolts than, say, mechanical pipe flange fasteners.

The pretension in a slip-critical bolt is very very large and the assembly should not loosen under load.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources