INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Sand production and line velocity check

Sand production and line velocity check

Sand production and line velocity check

(OP)
Hello everyone,

In the Salama method calculation for excessive erosion, he assumed a typical acceptable sand concentration as 5 ppm, but it had not been quoted in the OTC paper if this is on a mass or volume basis, can anyone shed a light on this? I presume a mass basis would be more reasonable.

Also, how do you quantitatively describe a 'sand free' production? Anything that is described as free is bound to the detection limit of the measuring instrument. Now from what I know, what is normally done to evaluate sand production is to route the production fluid to the test separator, and start to lower down the wellhead or choke pressure until sand is detected. But what's the typical detectable limit of this instrument?

Cheers all!

RE: Sand production and line velocity check

Why dont you have a look at the DNV methode for erosion (DNV-RP-O501).

I use "sand free" as 1 lb/1000 bbl. This is about 5 PPM (slightly less)

Best regards

Morten

RE: Sand production and line velocity check


Do not know if you want to quantify the amount of sand through your system? if its the case, one method is to divert the well through the Test Sep and manage to get the amount of sand. Another method is to simply install a sampling point downstream of the tree or the well flowline.
Then you can manually sample/filter/wash the outlet fluid and get the Sand. No matter how much sand is collected, you can estimate the volume as 1lb/1000 bbls and extent to total fluid produced per day.
At this point you can push the calculation to estimate the velocity taking into account the pipe dimention and total flowrate.
These are general steps for a manual sand volume estimates.
Hope this will help.
cheers
KK
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources