INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pile Installation Production

Pile Installation Production

Pile Installation Production

(OP)
Dear All,

Does anybody have records on pile installation productivity?  I would like to know the average installation per driving unit per day, both of precast piles and expanded bottom piles (reinforced), compaction type.

Soil is silty sandy, approximate pile diameter 0.4m x 20.0m lg.

Thank you for the help,

RE: Pile Installation Production

Quite a bit more information is required - how deep do the piles have to be driven? How "clear" is the site for movement of the rig? - for example.

RE: Pile Installation Production

(OP)
The piles in my project need to be driven about 20m, the piles' length is 25m.  The area is completely clear, no obstructions in around a 7 km radius.

I know that many factors affect productivity during pile installation, equipment, soil stratigraphy, labour, weather, etc. to mention a few.

What I am looking for is the average number of piles installed per day, per driving unit based on real experience. Is there a reference that can be consulted? Other than the R.S. Means books?

RE: Pile Installation Production

Pile driving production is always tricky to predict. Depends on a lot of variables. I don't know about the expanded base piles. I assume you are talking about Frankie piles. Since they are competive with other driven piles I would assume their production to be compariable to the prestress.
For prstess I assume there are no obstructions moderate driving. hydraulic hammer, 150 to 250 ton crane with fixed leads and a hydraulic service crane, and the piles have been spotted in advance. I would estimate somewhere between 10 to 20 piles a day, probably closer to 12.
Best reference would be a couple of local piling contractors.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.