INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pavement repair

Pavement repair

Pavement repair

(OP)
A waterline was broken in our private street by a contractor.  This resulted in a significant flood which saturated the road subgrade.  The next day, the asphalt pavement rose about 3 inches vertically while the curb and gutter stayed in place.  I suspect this was due to the expansive clay soils in the area.  City repaired the broken watermain and all trenches were patched with temporary cold mix.  This has been about a month ago and the pavement is still above the adjacent gutter by about 2 inches.  Cracking is present which could be attributed to the movement of the slab.  Homeowners association would like to require the City to repair it now, but I'm not sure how this can be done successfully.  If it is repaired now, wouldn't the subgrade eventually dry, shrink and subside thus requiring the street to be repaired again in the future?  Getting the City to come back again later would likely be difficult at best.  Any suggestions as to how to repair the road?

RE: Pavement repair

How to proceed:  Immediately.  Do not allow stall tactics.  Was the contractor working for the city?

RE: Pavement repair

(OP)
contractor was working for a the cable company.  City marked the waterline wrong and then the cable contractor dug and broke the watermain.  the city admitted that they marked the waterline wrong and are taking responsibility for it.  The city will be required to repair the road.

RE: Pavement repair

Get pictures...

RE: Pavement repair

(OP)
Guys, I have photos and I am going to require the City to make the repairs, but I am really looking for advice.  I am reluctant to push them to start immediately as the subgrade apparently is still wet.  Will I need to wait until the subgrade dries out, remove and replace the wet subgrade or another suggestion?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.