INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME B&PV SECTION VIII OVERPRESSURE PROTECTION

ASME B&PV SECTION VIII OVERPRESSURE PROTECTION

ASME B&PV SECTION VIII OVERPRESSURE PROTECTION

(OP)
If a Section VIII vessel normally operates with a gas bubble, but under extreme circumstances can be lined up to fill the tank solid, does one need to protect the tank from over pressure with a gas relief AND a water relief?  Would Section VII code requirements for overpressure protection be met if one could provide a gas relief for normal operation and use administrative guidelines i.e., procedures, to ensure that the valve line-up that would fill the vessel solid never happens?

RE: ASME B&PV SECTION VIII OVERPRESSURE PROTECTION

The details of your situation will greatly influence the answer to your question.  Heat & material balances, in & out rates, overall configuration, procedures etc. etc. etc. all come into play.  I get the impression that the water level would be the source of compressor to the gas.  If so, once the gas gets to the relief pressure the water level will continure to increase to the point of complete gas displacement.  No you're looking at a liquid relief rate that needs to match the liquid in flow rate.

I'd think a relief valve sized for vapor/gas relief would cover the liquid relief requirements, in general.

RE: ASME B&PV SECTION VIII OVERPRESSURE PROTECTION

(OP)
In this case, the gas relief is sized sufficiently for overpressure protection due to the gas, but after solid, the gas relief capability for water is only 20 GPM.  This is way too low to pass the incoming 150 gpm and prevent over pressure.  The admin control in this case is to ensure the valves are shut to prevent this inflow of liquid.  Do you think the code is violated if admin controls prevent the tank from becoming solid, and, therefore, overpressurized?

RE: ASME B&PV SECTION VIII OVERPRESSURE PROTECTION

Your use of the term "solid" is confusing me.  Do you mean full or are there three phases involed?

In any case, as a genereral statement it is probably acceptable to take credit for administrative controls.  I would highly recommend the decision to do so be made by a process hazards ananlsys or risk assessment group, not any one individual.  Everyone involved in the decision needs to be familiar with the process, systems, equipment, and operating practices.

RE: ASME B&PV SECTION VIII OVERPRESSURE PROTECTION

(OP)
Solid in this case means full with water, no gas.

Thanks for your response!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources