INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Adjacent foundation element

Adjacent foundation element

Adjacent foundation element

(OP)
Looking for practice is setting elevation of adjacent foundation elements.  For spread and/or continuous wall footing(s) I have used the rule of thumb of 2 horizontal to 1 vertical unless soils report says something like 1 to 1 would be acceptable.  Have used the same general rules for adjacent pile caps, bottom of caissons.  Are there any other opinions or systems that do not follow this general practice?

RE: Adjacent foundation element

The US Army Corps of Engineers "Engineering and Design - Bearing Capacity of Soils" says that the spacing should be a minimum of 1.5 x the footing width

Quote (EM 1110-1-1905):

Foundations on footings spaced sufficiently close together to intersect adjacent shear zones may decrease bearing capacity of each foundation. Spacings between footings should be at least 1.5B, to minimize any reduction in bearing capacity.
(footing width = B)
Here is the link to the document, see page 1-14
http://www.usace.army.mil/publications/eng-manuals/em1110-1-1905/toc.htm

www.SlideRuleEra.net idea

RE: Adjacent foundation element

We usually recommend 5 horizontal to 1 vertical "steps".

RE: Adjacent foundation element

In lieu of stepping down footings due to proximity of adjacent footings, you could consider excavating and pouring a lean conc mix, say f'c=1500 psi & unreinforced...bott of lean conc fill to comply with the 2:1 and then place your footings at the higher elevation on top of the lean concrete mix.

eric1037 - 5 horz to 1 vert...is that for bott of caissons? seems high for typ footings.

RE: Adjacent foundation element

You can place foundations closer together as long as you account for overlapping shear zones for bearing capacity concerns as well as overlapping zones of stress increase for settlement analysis.

For most cases, the 5 horizontal to 1 vertical will reduce overlapping zones.  However, for large foundations, this may need to be increased.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources