INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Doubler plate for Tubular connection

Doubler plate for Tubular connection

Doubler plate for Tubular connection

(OP)
The doubler plates are used quite often for secondary attachments  weld to main structure and the temporary connection. But i have the following questions about it:
1.why use doubler plate? Is it used to make the cutting of the attachemnts more easy? If so, can we cut the temporary 3mm awary from the parent material to avoid damage the chord(not use doubler plate)?
2.If a doubler plate is used, it can resist more axil compression, but can it resist tension or bending?
3.If doubler plate can resist tension of bending, how to calculate weld size and check the thickness of the doubler plate?

The above puzzle me a lot, hope someone can help.

RE: Doubler plate for Tubular connection

(OP)
Biginch, thank you for your answer.
Do you mean that a doubler plate is not necessary if the punching shear is enough even the brace is a temporary brace?

RE: Doubler plate for Tubular connection

There are a number of ways doubler plates can be used as a joint reinforcement, so it would be good to see a diagram of the connection. Can you post a sketch somewhere?

BigInchworm-born in the trenches.
http://virtualpipeline.spaces.msn.com

RE: Doubler plate for Tubular connection

(OP)
Biginch, The problem is for a pipe to pipe connection, so it's a curved plate.
Most articles say that the doubler plate will increase the ultimate strengh of joint whether the brace is compression or tention brace(they do fem analysis and experiment).
I think the doubler itself and the weldment between the doubler and the chord should be checked, but i don't know how to check, and if there are some formulars to check?
I have not found articles on this problem, hope someone can help.

RE: Doubler plate for Tubular connection

Peter,  Its been a long time since I've actually designed a connection, so why not see if you can get some advice from the structural engineers?  There is a forum specifically for structural.

BigInchworm-born in the trenches.
http://virtualpipeline.spaces.msn.com

RE: Doubler plate for Tubular connection

There is a commonly used way to get around doublers at a pipe connection to save money.  Use thicker pipe at the connection and then neck the pipe to thinner wall a few feet away from the connection.  This effectively gives you a doubler at much less cost and complexity.  It also allows you to use standard formulas to calculate stresses at the connection because you're using standard pipe.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources