INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Warning Message 79 - Submerged Primary Device Outlet

Warning Message 79 - Submerged Primary Device Outlet

Warning Message 79 - Submerged Primary Device Outlet

(OP)
I'm trying to fully understand the cause of Warning Message 79 (HydroCADD Version 6.10).  I received the following message:

"[79] Warning: Pond M020 Submerged Pond M019 Primary device #1 OUTLET by 0.37'"

This is a closed drainage system.  Ponds M020 and M019 are manholes connected by a 12" RCP.  As I understand the message, conditions in Pond M020 result in the peak elevation being 0.37' (4.44") above the RCP invert at Pond M019.  This means the pipe is about 1/3 full at the peak flow.

Am I interpreting this correctly?  What's the problem with this situation?

RE: Warning Message 79 - Submerged Primary Device Outlet

I think your question was also sent to HydroCAD support and answered.

Please do not cross-post.  It just takes more time for everyone.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources