INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Frost Protection Pit slab/foundation

Frost Protection Pit slab/foundation

Frost Protection Pit slab/foundation

(OP)
I have a 100'x160' Pre-Engineered building sitting on mass column piers 5'x5'x3'-6" deep and a 8"x3'-6" frost foundation around the perimeter.  I have a conveyor pit 10' deep 18' wide 150' long (open top - no heat) going out the side of the building.  Question... What do I do under the pit slab/footing which is 12" thick reinforced concrete to prevent frost lifting the pit which is attached to the building foundation.  To make it worse at the end of the pit I have 100' tall conveyor support tower with the legs sitting on top of the pit wall.  I am considering 2" rigid polystyrene under and up on the side of the footing...  Reportedly, 1" is equvalent to 4' of earth cover. My total bearing preasure is around 600psf and reportedly blue board insulation's compresive strenght is around 2,150 psf.  

RE: Frost Protection Pit slab/foundation

What's the design frost depth in the area, what type of soils under the pit, how much movement can be tolerated...

But yes I think placing some insulation under and around the pit would be more economical than digging out 4 feet to 6 feet of soil and replacing with NFS material. The normal rule of thumb I've heard is 1" insulation = 1' earth cover, but modeling shows it worth more like 2' to 3'.  In solely thermal resistance it may approach the 4' number but soil also slows frost with the latent heat of fusion in freezing it. Would be good to provide some NFS material under/around pit if available, say 6" min or 1' better, along with insulation.  And you can get insulation with up to 60 psi compressive strength so 600 psf should not be a concern.

Good info at this link:
http://www.dow.com/styrofoam/na/

RE: Frost Protection Pit slab/foundation

(OP)
CarlB,

My thoughts exactly...  I just wanted to make sure I had not overlooked anything, or anybody had any better ideas.  I will be using 6" of granular under the slab.  Thanks for the response!

Jeff

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources