I am trying to put a panel schedule together, but I have never done it before. It is for a pool building that has some pumps for the pool and spa. I saw an example of another one that shows equivalent load on the A and B phase, my question is whether this is required for 240 Volt application because you are using both phases. For the other lighting loads, only the A or B phase is shown having a wattage. Please help! Thanks!





RE: Basic EE stuff
JRaef.com
Eng-Tips: Help for your job, not for your homework Read FAQ731-376
RE: Basic EE stuff
RE: Basic EE stuff
Where I work, we'd show it on both phases.
RE: Basic EE stuff
RE: Basic EE stuff
Smart move. I'm sorry, I don't mean any offense, but
I don't do structural building designs even though I still
have my statics book from college......
A mechanical and I were talking about statics that we
took in college (many years ago) last night! Fond memories,
but I would feel dangerous with anything that someone would
live/work in! Much less swim in.
The scheduler could cause a problem if not connected by
someone with some experience in the field. I could see
a "hot chassis" on the panel, and wet floors and I really
shudder!
Thanks for taking the safer approach.