INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

API 650 Addendum 4

API 650 Addendum 4

API 650 Addendum 4

(OP)
I have 2 questions regarding this Addendum.

1) What is its exact date if issue ?
2) What are its implications if compared with previous  API650 tanks ?

Thanks,
Theo van Adrichem

RE: API 650 Addendum 4

You'd have to look on the Addendum itself for the dates.  If you have the otherwise-current API-650, you should be able to download the Addendum 4 for free (although it is in fact, an entirely new API-650- every page, not inserting pages).  You'll have to contact API for this.

Implications- Wind design is changed, allows thinner shells but requires anchorage in more cases; seismic is all changed up, and requires seismic design in wider areas; some new material such as vacuum design added.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources