hi guys,
I am selecting Mechanical seal plan(API 682) for Asphalt service for rotary pump(API 676). from rundown asphalt rated temperature can be 450. I have selected plan 53. i am exploring other options as in plan 53 need to have pressuried reservior to pump barrier fluid.
Can anyone suggest other plan than plan 53 for viscous pumped fluid like Asphalt(keeping in mind shutdown time when asphlat properties changes?
Regards
Rotaryguy.
I am selecting Mechanical seal plan(API 682) for Asphalt service for rotary pump(API 676). from rundown asphalt rated temperature can be 450. I have selected plan 53. i am exploring other options as in plan 53 need to have pressuried reservior to pump barrier fluid.
Can anyone suggest other plan than plan 53 for viscous pumped fluid like Asphalt(keeping in mind shutdown time when asphlat properties changes?
Regards
Rotaryguy.





RE: API flush plan for Asphalt service
RE: API flush plan for Asphalt service
here also,have 3-screw pump but... our guys are not comfortable with utilities issue. they are not interested in Jacketed body. somehow they are hesitant in the use of steam tracing too. only option is now electrical tracing with insulation, in order keep asphalt changing properties during shutdown.
have you tackle any 3-screw with electr. tracing with API plan? your inputs are appreciated.
Rotaryguy.
RE: API flush plan for Asphalt service
RE: API flush plan for Asphalt service
One more issue is that vendor deviating from API 676's requirement of Balanced mech. Seal(API 682) he is suppling unbalanced one. basis of selction is that seal is subjected to only inlet pressure(suction). the pumped fluid enters seal chamber & recirculted back to suction line.
I just stared as novice(few month back)i am trying to digest concepts as much as possible. need some mentor....
Rotor...
RE: API flush plan for Asphalt service
RE: API flush plan for Asphalt service
Rotor
RE: API flush plan for Asphalt service
If you can afford some product dilution a Plan 32, injecting a process compatible cool fluid into the seal chamber, could also improve reliability of the seal by reducing coking and improving conditions at start-up. Take into consideration the cost of recycling or loosing the injected fluid into the process stream. The rate of injection depends upon the application and how tight a bushing can be fitted into the seal chamber.
Dual pressurized seals are another way to go.
My preference for hot asphalt in a big seal chamber/stuffing box - dual stationary mounted metal bellows with a Plan 54 seal support system.
A Plan 54 is essentailly a lube oil skid for the mechanical seal. The skid generally consists of a set of pumps, a heat exchanger, filter, oil reservoir of a decent size ( from 25 to 100+ gallons), regulators, relief valves, level switches and alarms, pressure switches and alarms and so on.
Sophisticated systems can track the pressure of the pump so that the system pressure is always 25 or so psig above the process side of the seal, and have systems to maintain pressure in the event of a power outage or pump failure.
This a significant initial outlay. However, this system will ensure that nice clean fluid is always lubricating the seal faces from start-up to shut down. No coking will occur, so no hang-up problems or "secondary seal face" build up.