INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Caltrans Detail Barrier

Caltrans Detail Barrier

Caltrans Detail Barrier

(OP)
Hello,
I am designing a barrier type 26 per Caltrans detail B11-54. I am building this barrier on top of a new box culvert and wingwalls. On the caltrans detail, there are two barrier types:

1. Type 26: On Bridge Deck
2. Type 26A: Off Bridge Deck

I don't know what Caltrans means by "Off" or "On". Can somebody please clarify?

Also, I am designing this for a civil engineer who is clueless about construction, as am I. He wants to know if, instead of us (the structural engineers) detailing the barrier, whether we can just call it off as "Barrier per Caltrans Detail B11-54 Type XX". I do not feel comfortable doing this. Any recommendations? Thank you in advance for any help.

RE: Caltrans Detail Barrier

My Caltrans Standard Plans and experience are a little dated, so please bear that in mind.

Note that both of these types (Type 26 & Tppe 26A) are concrete barriers with an adjacent sidewalk.

The Type 26 barrier shows the sidewalk on top of a "conc deck or finish grade" and indicates that the dowels at the face of curb and at the back side of the rail are embedded into that concrete.  The barrier is on top of a bridge deck, or possibly in your case, a box culvert with no cover.

The Type 26A barrier shows the sidewalk with a thickened edge at the face of curb.  This is to indicate the section of barrier that is placed on top of the wingwall.  The reinforcing bars at the face of curb are completely contained within that thickened edge, while the vertical bars at the back face of barrier extend down into the top of the wingwall (or retaining wall or headwall) stem.

So, if your box culvert has soil cover, I think the Type 26A is appropriate, with the back face bars extending down into the culvert headwall.  If it is a box culvert with no cover (direct bearing), I believe you would use the Type 26 over the culvert, and a Type 26A on the approaches/wingwalls (assuming the Caltrans standard U-back wingwall configuration).

I also don't see any issue with referring to the Caltrans Standard Plans for the design details (concrete and reinf.).  Caltrans bridge plans do not detail these items separately, but merely call out the Standard Plans reference.  The Standard Plans are automatically part of any Caltrans plan set.  In fact, if Caltrans had done these plans (box culvert and barrier), you would likely see very little of these types of details in the contract plans.  Both the box culvert concrete & reinforcing and the barrier concrete & reinforcing would be indicated by referencing the appropriate Standard Plans (like D81 and B11-54, for example).

If these plans are to be reviewed by Caltrans, the B11-54 detail would be very clearly understood by the reviewer.

Hope that helps.




Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources