INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Reduced Loading For construction time temporary slab load?

Reduced Loading For construction time temporary slab load?

Reduced Loading For construction time temporary slab load?

(OP)
Pals

Load factors are based on probabilities, as far as I know. There are cases when we have to put temporary load directly on slab during construction, and I am concerned on whether reduced load factors can be used for such loading.

Is there any reduction? Cant find anything in the code.

What risk is applicable for such loading? same as long term loads?

regards
IJR

RE: Reduced Loading For construction time temporary slab load?

Review ASCE 37-02. It deals with temporary loads during construction. For the most part, loads during construction are similar to those of a finished building - that said, the construction period is the most dangerous time in the life of most buildings.

What kind of load are you applying?

You may have more available residual capacity than you realize as during some stages of construction, not all deadload has been applied or installed and that capacity is still available from the structural system.

Good Luck,

Daniel Toon

RE: Reduced Loading For construction time temporary slab load?

(OP)
DTGT2002

The most common loading we apply is crane truck load used to erect steel roof structure on top of a reinforced concrete floor.

I agree with you that this loading can be dangerous, I am only looking for literary work on such loadings

Thanks for pointing out ASCE 37-02

respects
IJR

RE: Reduced Loading For construction time temporary slab load?

Is this a slab on grade?

RE: Reduced Loading For construction time temporary slab load?

(OP)
No mitchelon

it is elevated. and rests on a beam column grid system. The slab is two way.

respects
ijr

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources