INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pipes for Pipe Jacking

Pipes for Pipe Jacking

Pipes for Pipe Jacking

(OP)
Hi there,
do somebody knows if there is a difference between a pipe for jacking into sand using EPB TBM and without using EPB?
Thanks

RE: Pipes for Pipe Jacking

I don't profess to know a lot about this field, but I suspect you are probably talking about "earth pressure balance" in the vicinity of the cutting face, in the context of tunnel boring (machine) operations etc.  I do know the paper at http://www.hatchmott.com/documents/adobe/Segment%20Design_RETC%202003-from%20CD_Kramer%20et%20al-L.pdf#search=%22earth%20pressure%20balance%20pipe%22 , under the heading “Modeling Earth Pressure Balance Effects”, contains the statement, “While this
has the beneficial effect of reducing surface settlements, it results in increased lining
loads in comparison to open mode tunneling methods.”

RE: Pipes for Pipe Jacking

(OP)
Thank you!  You are right. But the article compares segmental rings (EPB TBM) and cut & cover pipes and not the differences in pipe loads when using EPB machines or machines without EPB.

RE: Pipes for Pipe Jacking

Are you looking at axial pipe loading (i.e. TBM advance-induced stresses) or ground pressure 'hoop' stresses?

EPB vs. non EPB should have little effect on the ground pressures exerted around the tunnel.  However, when considering axial liner loading, the TBM must exert enough pressure to overcome the design Earth Pressures for EPB operation.  

RE: Pipes for Pipe Jacking

with EPB machines, practice may be to use minimal or no overcut to limit settlement, this results in potentially less soil loosening and full load transfer from the soil to the pipe.  This may increase the jacking load.  Reference Pipejacking and Microtunneling by James Thomson, 1993

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources