INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Vacuum Sewer Valve Pit/Lift Station Retro-fit

Vacuum Sewer Valve Pit/Lift Station Retro-fit

Vacuum Sewer Valve Pit/Lift Station Retro-fit

(OP)
I am working on a project in which a school and teacher housing will have gravity sewer lines to a lift station. We will eventually turn the system into a vacuum sewer system and the lift station into a vacuum valve pit. Does anyone have any experience with this conversion from a lift station to a valve pit.

RE: Vacuum Sewer Valve Pit/Lift Station Retro-fit

We have done this several times and in most cases we used this when for example the total area was not suitable for a vacuum sewer system due to different ground levels or  we used this option if one of the buildings is to far from the vacuum mainline and is was more cost effective to use a small lif station which pumps it into a vacuum chamber. Anyway what is important is the flow coming into this vacuum chamber to determine the number of vacuum valves, vacuum chamber size. Also where is this school located, at the end of the mainline or near the vacuum station etc.

RE: Vacuum Sewer Valve Pit/Lift Station Retro-fit

The most important thing about your proposal is the gpm that will be pumped. Each valve should receive 15 gallons per minute on average, each valve can handle more for short periods. Just add additional vavle pits to the location where you will receive flows. The absolute most important thing you need to do is split the flows from the lift station equally amonst the different valves, each valve needs to receive an equal portion of the flows.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources