×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

CCE 1"66 plugging

CCE 1"66 plugging

CCE 1"66 plugging

(OP)
An oil producer well here in the field has an obstruction in CCE(1"66 conduit into the oil production tubing 4 1/2")this CCE is the means to injection wash water, then it was completely pluuged.

Scale Deposits built up at first 100m to surface,Chemicals(corrosion & scale inhibitors) are injected via this CCE with fresh water (wash water).water injection pumps (BSBpumps)did not equiped with filters.and they supplied water by a big water tank of 50m3 in bad status.

i want i one could help to interpret this phenomeno, how this scale was in the upper area

is this problem significantly related to the temperature profile or there are other factors???

Plz help
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources