INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Hysys multiphase flow

Hysys multiphase flow

Hysys multiphase flow

(OP)
Guys,

How to input multiphase flows (i.e.) oil rate 5000 bbl/d & gas rate 5 mmscf/d in the stream line.

Thanks & Regards,
oilgas80

RE: Hysys multiphase flow

you need to have the composition of combined fluids then when you enter molar flow it will calculate the gas and crude flows. This is not always convenientbecause the overall well composition given often doesnt give you the actual design flowrates asked for, so what we usually end up doing is entering composition from design basis for the wells and using a adjust function to add an inert gas (i.e. one that wont effect flash calcs such as methane) to get gas and crude rates to match the design basis. You first adjust total well fluids untill you have the correct crude rate after processing then add methane to get correct gas rate.

RE: Hysys multiphase flow

another way to achieve the desire result is to create seperate stream for the oil and gas. input the compositions for each stream but at the same temperature and pressure.

input the flowrate for the oil and specify a molar flowrate on the gas stream till it gives you the desired gas flowrate in MMSCFD.

then, combine the two streams using a mixer. HYSYS will recognize the output flowrate as the reservoir flow rate.

RE: Hysys multiphase flow

maybe i see your problem:

You have a specified composition from the reservoir ppl - and a specified flow rate of oil&gas - but the flow rates does not match the calculated flow rates by hysys - you cant get them both to match - if the oil rate matches then the gas rate is off and vise versa.

There are two solutions:

1) Either annonce that you will match the oil rate (or gas rate whatever your preference) and the gas rate will be off

or

2) If gas is less than expected then make a gas stream with a composition that matches the gas phase from a 1 stage split at standard conditions of your reservoir fluid and mix it with the reservoir fluid and use an adjust until you get your desired flow rates - if oil is less then use the oil stream.

Rememeber to raise the issue with the reservoir ppl and inform them of your approach - so that confusion dont arise later on.

Best regards

Morten

RE: Hysys multiphase flow

(OP)
Hi,

I have to follow the standards for producing my specifications for the Process Piping.

I was confused, whether,i have to follow,

1.ANSI B31.3 or
2.ASME B31.3

Please clarify my query.

Thanks & Regards,
Kumar

 

RE: Hysys multiphase flow

oilgas80

This belongs in a new tread (and in a different forum. Try to repost in a mechanical engineering forum.

Best regards

Morten

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources