INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Post Weld Heat Treatment

Post Weld Heat Treatment

Post Weld Heat Treatment

(OP)
Dear All,

Can somebody help me to find any technical book or web site which gives the rules how can we determine if a PWHT is required for any carbon steel ?

Thank you

RE: Post Weld Heat Treatment

The construction code will give requirements for PWHT.  

RE: Post Weld Heat Treatment

In case of piping, refer to the table of ASME CODE B31.3.
and in case of pressure vessure, refer to the UCS-56 of ASME CODE SEC.8

RE: Post Weld Heat Treatment

(OP)
Thank you All,

I agree that some codes specifiy the requirement for PWHT, but some standards or codes do not specify clearly ex. AWS D1.1 or API 5L or AWWA C200...

I look for some thing to help the engineer to decide for PWHT when not clearly specified in the codes or standards.

Best Regards

RE: Post Weld Heat Treatment

I use Annex I of AWS D1.1 Guideline for Alternate Methods for Determining Preheat, paragraph I6.

I like the method described in paragraph I6 because I can determine the chemistry of a sample taken from the material to be welded and determine the preheat requirements provided the carbon equivalency falls within the ranges listed. It also considers the level of hydrogen control and degree of restraint.

I do a lot of repairs on large presses and other equipment where the original drawings are "lost" or otherwise not available. Even when the drawings are available, the chemistry of the actual parts vary from what was specified. The preheat determined by Annex I is usually higher than some other methods, but more preheat is usually better than less preheat when working with heavy components made from carbon steel and low alloy high strength alloys, both hot rolled and cast.  

I set up an Excel spread sheet that does most of the calculations once I plug in the chemistry.

I also used a book titled "Weldability of Steels" by R.D. Stout. My edition was copyrighted in 1987. You can probably find a copy at Amazon.

Post weld heat treatment is another story. Welding codes or references from ASM are helpful for determining stress relief, but there are other reasons for doing PWHT. The purpose of the PWHT must be determined before settling on a course of action.

Good luck - Al

RE: Post Weld Heat Treatment

Quote:

I look for some thing to help the engineer to decide for PWHT when not clearly specified in the codes or standards.



I would recommend developing a spreadsheet and using ASME Boiler and Pressure Vessel Code (Section 1 and/or Section VIII) post weld heat requirements as a general guide. These PWHT requirements have been established based on many years of experience and research of materials fabrication.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources