INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Man vs Machine

Man vs Machine

Man vs Machine

(OP)
     I'm trying to develope a simple calculator (in Excel)to compute machine hourly rate and operator hourly rate, combined with net profit, in order decide whether to run 1 machine with one operator (eg. with thruput efficiency of 97%) or two machines with one operator (eg. with thruput efficiency of 66%). Inputs would be; 1)hourly rate of machine (eg. $40/hr) 2)hourly rate of operator (eg. $35/hr)3) thruput (eg. 236 pc/day) of both one operator running one machine and thruput (eg. 320 pc/day) of one operator running two machines. 4) Value per unit (eg. $5.36 ea) Output would be 1) profit per hr according to the resources given. Anyone have any ideas? It would be greatly appreciated. Thanks

RE: Man vs Machine

In the calculation you are missing one cost of raw material (I am assuming that what you call "Value per unit" is you selling price);
Furthermore, is there any possibility that if you have 2 machines/1 operator that your quality problems increase?
If not, and it the function of the operator is basically feed the machine and take out the final product, then your setting of 2 machines/1operator will be always more profitable (in USD). It is just a question of balancing your line in order to not have the machines stopped at the same time (either waiting for raw material or to be removed the final product).
In your case you don't even need a Excel spreadsheet. Let's look to your figures:
Cenario (again without raw material costs.Assuming that raw material costs are proportional to quantity):
1 machine/1 operator Assuming 8h/day:
Costs:40*8+35*8=600USD
Nr.pieces:236/day
Cost/piece:2.542USD
Profit (assuming that you sell as you produce):
236*5.36-600=664.96USD

Cenario 2:
2machines/1operator:
Costs:40*2*8+35*8=920USD
Nr.pieces:320/day
Cost/piece:2.875USD
Profit:
320*5.36-920=795.2USD.

The bottom line is that you have slightly extra costs/piece in cenario 2, but since you sell more, in the end your profit(in USD) grows.

Unless I misundertood your problem, this is a fairly easy thing to calculate.

RE: Man vs Machine

Is this for class?

TTFN



RE: Man vs Machine

One other consideration is the work load on the machines. Say the machines are loaded to full capacity when you do the reassignment the machines become overloaded requiring either overtime, additional equipment or outsourcing. If the shop is a daylight only shop it could mean opening up a second shift with the attendant overhead costs.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources