GTG Delivery Period
GTG Delivery Period
(OP)
Hi,
Anyone got any info regarding the fastest delivery period of 25MW GTG? Was informed that at present due to increase work load/order all around the world, the delivery period has increased. Example, last year when we placed the order for 4 GTGs, the delivery period was only 12 months. Now when I check with that supplier, the period has been increased to 18 months (PO to FOB). Anyone knows of any particular supplier who can deliver the 25 MW range GTG within 12 months (PO to FOB)
Thanks
norzul
Anyone got any info regarding the fastest delivery period of 25MW GTG? Was informed that at present due to increase work load/order all around the world, the delivery period has increased. Example, last year when we placed the order for 4 GTGs, the delivery period was only 12 months. Now when I check with that supplier, the period has been increased to 18 months (PO to FOB). Anyone knows of any particular supplier who can deliver the 25 MW range GTG within 12 months (PO to FOB)
Thanks
norzul





RE: GTG Delivery Period
http
I think you mention frame size machines in other posts. Do you have to have a frame type GTG? Have you tried GE Aero or Pratt & Whitney, or Rolls Royce?
Are you looking for a 50 hz or 60 hz machine?
rmw
RE: GTG Delivery Period
Since we already got 4 Frame 5 GTGs, I thought it is logical to continue with the frame 5 as well. However, if the delivery time for frame 5 machine is way off our expectation, we may consider other types of machine e.g. GE Aero, Hitachi H25. At present, we still focus on F5.
We are looking for 50Hz machine.
Thanks
norzul
RE: GTG Delivery Period
rmw