INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Inspection of 38MW Siemens Generator Type TLII 124/19-15

Inspection of 38MW Siemens Generator Type TLII 124/19-15

Inspection of 38MW Siemens Generator Type TLII 124/19-15

(OP)
We are planning to inspect a Siemens 4 pole 38MW Generator (type TL11 124/19-15) shortly. This is a steam turbine driven (via gearbox)machine with air cooling, air to water heat exchanger. It has been in service for 10years (Manufactured in  1995) but only approx. 7months per year actaul running the rest is idle (Total = 50,000hrs).

Does anyone have any knowledge of common problems or faults in these Siemens machines which may be discovered once the rotor is removed?

I am only new to the forum, but I think it is very very good. I am glad I have come across it.

Thankyou

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources