INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Drawing Template Link Conventions....

Drawing Template Link Conventions....

Drawing Template Link Conventions....

(OP)
I would like some advice on drawing template conventions:

1. What items do you typically link to the drawing?

2. What items are typically linked to the model?


Should I be pulling the rev off of the model or should I be setting it in the drawing file?

I would just like to do this correctly the first time.


Thanks

Tim

RE: Drawing Template Link Conventions....

This heavily depends on your needs.  Are you an individual, or setting up a system for a new company?

RE: Drawing Template Link Conventions....

On dwgs: I usually link date, no of sheets and drawn by. On dwgs linked to model: title, material, sometimes weight, saved date. I do not link revs because it always conflicted with PDMWorks revs for most users.

Chris
Systems Analyst, I.S.
SolidWorks 06 4.1/PDMWorks 06
AutoCAD 06
ctopher's home (updated 06-21-05)

RE: Drawing Template Link Conventions....

(OP)
Currently a single user but we will be adding another engineer soon. We are using PDMworks and I want to set it up for myself to use right now and not face any difficultys in the future when we add another designer.

Today I have it set up like this:

Linked to Model:
Title
Material
Weight


Linked to Drawing:
Drawn By
Drawn Date
Checked By
Checked Date
Approved By
Approved Date


I am unsure on the REV at this point where to link it to.

Tim

RE: Drawing Template Link Conventions....

Tim,

Everything checked into PDMWorks will have the following properties added to it: Number, REV, Project, Author, and Status if you are using a revision scheme that warrants it.

I would also consider having a modelled by or engineered by on the model. You also might want to consider a finish applied to the model if you build things that have many different finish options. Then you can link the finish to the drawing when the model is placed in it.

Best Regards,
Jon

Challenges are what makes life interesting; overcoming them is what makes life meaningful.

Solidworks 2006 SP0.0

RE: Drawing Template Link Conventions....

I link to the model whatever information is important to recreate the drawing in case I lost it. Who did the drawing is not inportant so it is linked to the drawing but some of the notes might be important so they are linked to the model. I don't use PDM so I have revision linked to the drawing. You may have a second revision linked to the model but that should no show on the drawing and it should be just for your records.

RE: Drawing Template Link Conventions....

My advice is to keep all the information on both drawing and model.  This is actually what I've set up at my company.  

It's easy enough with PDMWorks to keep all the same information on both the drawing and model.  The PDMWorks check-in screen allows the user to simply highlight a column and apply a single values to all fields in that column.


Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.