INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Angle of Repose for Chrused rock

Angle of Repose for Chrused rock

Angle of Repose for Chrused rock

(OP)
We ofter use 3/4" crusher run for backfill but I can't find the angle of repose for this type of material.  I assume that is greater than for gravel and therefor over 40 but does any =one have any authorative  data on such?

RE: Angle of Repose for Chrused rock

Call your local suppliers.

RE: Angle of Repose for Chrused rock

The 1971 Estimating Manual for Hydraulic Excavators, by Koehring Company lists the Angle of Repose for gravel as 35 degrees.  Koehring manufactured large hydraulic backhoe excavators.  35 degrees sounds conservative to me.

RE: Angle of Repose for Chrused rock

The "US Steel Sheet Piling Design Extracts" is in close agreement with the value PEinc presented. For "Gravel,dry, 1 inch and under" the angle of repose is given as 36 degrees, 52 minutes. (This false precision comes from back-figuring the given slope ratio of "1 on 1 1/3").

You can download this document from this page of my website
http://www.slideruleera.net/Steel-Piling.html
See page 8.

www.SlideRuleEra.net idea

RE: Angle of Repose for Chrused rock

...looking a little farther down the list (on page 8), also see what could be be an important difference:
"Limestone, fragments, dry, 1 inch and under" angle of repose = 45 degrees.

Must be very dependent on the material that the crusher run is made from. (Here, it is sedimentary limestone)

www.SlideRuleEra.net idea

RE: Angle of Repose for Chrused rock

36 degrees, 52 minutes????  Sounds a little low. I'd probably use 36 degrees, 56 minutes, 27 seconds.

RE: Angle of Repose for Chrused rock

Good Idea! I had better clarify, for whatever reason ponder, US Steel (not me - I know better, from slide rule days smile) chose to print the figure 36 degrees 52 minutes.

www.SlideRuleEra.net idea

RE: Angle of Repose for Chrused rock

(OP)
Thanks for the response, I paln to use 40 deg.

RE: Angle of Repose for Chrused rock

The "standard" angle of repose in the aggregate industry is 37 degrees for crushed stone.  For design we look at the range of 35 - 40 degrees.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources