INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Steel Surge Tank Hyrostatic Test

Steel Surge Tank Hyrostatic Test

Steel Surge Tank Hyrostatic Test

(OP)
In  water pumping system that has 30bar operating pressure one surge tank is intended to be installed, the manufacturer of the surge tank is going to do hydrstatic test for this tank. What is the minimum recomended value of the test pressure ? is it 1.5 times the rated operaing pressure, 2.66 , 1.33 , ? I need to know what is the minimum value of testing pressure inaddition to the minimum period of time for this test ?

RE: Steel Surge Tank Hyrostatic Test

ccc123;
Is the manufacturer of the surge tank asking you this question or are you simply attempting to verify the multiplier factor for hydrostatic testing by the manufacturer? I can give you several responses, however, you need to verify the Code (ASME) or other Standard used for design and fabrication of the surge tank.

RE: Steel Surge Tank Hyrostatic Test

(OP)
The manufacturer did not ask me, But I'm attempting to verify the multiplier factor for hyrostatic testing.The tank is fabricated inaccordance with ASME Boiler and pressure vessel code, Section VIII.

RE: Steel Surge Tank Hyrostatic Test

Ok. The hydrostatic test pressure should be 1.3X design pressure.

RE: Steel Surge Tank Hyrostatic Test

(OP)
Dear metenger , Thanks alot . But what about the time do we need to run the test for 4 hours or less ?

RE: Steel Surge Tank Hyrostatic Test

Whatever time is needed by the Inspector to assure no leaks - probably 15-20 minutes under pressure.

RE: Steel Surge Tank Hyrostatic Test

On large atmospheric tanks or on pipelines, it is not uncommon to hold the hydrotest condition for a specified period as a part of leak detection.  On a vessel that can be conveniently inspected on all sides during the test, this isn't required, so there's no set minimum time.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources