INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Sprinkler Head Clearances

Sprinkler Head Clearances

Sprinkler Head Clearances

(OP)
We are installing new cable trays in one of our older computer rooms that has a pre-action sprinkler system and a very limited ceiling height.  I realize the clearance under a sprinkler head is 18", but is there a regulation that limits the tray distance from the ceiling if not directly under the sprinkler head?  The cable tray that is being installed is a basket weave, open style tray.  One tray will house network cables (fiber/copper) and the other is for power.   

RE: Sprinkler Head Clearances

Check into NFPA-13 2002 edition starting a 8.6.5.2, this use to be called the beam blocking rule but has grown much over the last several editions of NFPA.

Hope this helps.

G3

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources