Pipe Bursting of 21" VCP and replace with 32" HDPE
Pipe Bursting of 21" VCP and replace with 32" HDPE
(OP)
All,
Thanks in advance for you help. I am replacing a 21" VCP with a 30' HDPE. Open trench is not an option, therefore, I am looking into the trenchless technology. I am sure contractor can pipe burst a 21" VCP, however, I am not sure if they can replace a 32" diameter pipe (DR 13.5, ID 27"). If pipe bursting is not possible, please recommend other methods. Thanks again.
Thanks in advance for you help. I am replacing a 21" VCP with a 30' HDPE. Open trench is not an option, therefore, I am looking into the trenchless technology. I am sure contractor can pipe burst a 21" VCP, however, I am not sure if they can replace a 32" diameter pipe (DR 13.5, ID 27"). If pipe bursting is not possible, please recommend other methods. Thanks again.





RE: Pipe Bursting of 21" VCP and replace with 32" HDPE
RE: Pipe Bursting of 21" VCP and replace with 32" HDPE
As far as other methods, bite the bullet and go open trench. The cost of trenchless methods may be more than open trench with the restoration. There is, I think, a mirco-tunneling process (pipe eating or something like that) that uses the new pipe to carry away the spoil from the tunneling operation that you might want to check for feasibility.
RE: Pipe Bursting of 21" VCP and replace with 32" HDPE
You can go to WWW.mears.net is one company that does this There is TT Technology,there is a company hammerhead I believe.
These are all different method.
We did pipe bursting on sewer lines and went from a 8" to a 12" on our projects.