Is hydrostatic test part of non-destractive test? And if no does it effect the material(pipe or hollow bar), its stracture?
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
|
RE: Hydrostatic test
Steve Jones
Materials & Corrosion Engineer
http://www.pdo.co.om/pdo/
RE: Hydrostatic test
@SJones: I don't think so. Hydrostatic test is non-destructive (without any ifs).
A destructive test is not complete until the specimen undergoes permanent deformation, which is not always the case in hydrostatic testing.
Test parameters (pressure and duration) are not so selected as to protect the specimen, they are specified by design and it is up to the specimen to withstand or fail under the conditions.
As for physical changes in the metal, such as effect on molecular structure etc., it is true that the material suffers certain effects under the applied pressure. But the assumption is that within the limits of test pressure, all deformation is reversible (elastic only), at least theoretically. The material is expected to resile back to its original condition after the test pressure is removed.
In reality, some of the effects may remain and influence the physical properties of the material to a small extent for the rest of its service period. This may not be very significant.
Just my 2 cents.
RE: Hydrostatic test
anything else is just speculation. if you destroy the vessel is because you put too much pressure beyond the vessel test pressure.
it becomes destructive with proof tests.
genb
RE: Hydrostatic test
See Genb's reply above. Test parameters can also be selected by the user that go beyond the minima expressed in standards, in which case, they are NOT 'specified by design'. Think about what one is trying to achieve with the hydrotest and think about relationships between stresses and hold times.
Steve Jones
Materials & Corrosion Engineer
http://www.pdo.co.om/pdo/
RE: Hydrostatic test
What Code or Standard might you be thinking of in this regard? The ones I'm familiar with specify a hydrotest with the intent that the vessel is not damaged.
Steve Braune
Tank Industry Consultants
www.tankindustry.com
RE: Hydrostatic test
Steve Jones
Materials & Corrosion Engineer
http://www.pdo.co.om/pdo/
RE: Hydrostatic test
Thanks for that piece of info. That doesn't seem too much different that the ASME VIII hydrotest that would develop shell stressses as high as 90% of yield for some carbon steel materials. In a static load case such as a hydro test, how do you determine the time for short vs long term. It does not seem as though the test duration would have much influence on the results.
Steve Braune
Tank Industry Consultants
www.tankindustry.com
RE: Hydrostatic test
Steve Jones
Materials & Corrosion Engineer
http://www.pdo.co.om/pdo/
RE: Hydrostatic test
I've always considered a hydro the first cycle in the shakedown cycle.
Hydro's can also provide a modicum of stress relief if high enough and if held for some period of time, can blunt defects if the defects don't result in failure.
Cheers
Rob
RE: Hydrostatic test
RE: Hydrostatic test
It will affect material properties at local stress raisers- assuming the material has the minimum required ductility at the test temperature and the vessel was fabricated properly, there will be local yielding and some degree of hardening at the stress raisers. Many simplified stress concentration factors are on the order of 2.5-3 ( can be as high as 5 at the edge of a crack), but on a microscopic scale and considering yielding and fracture mechanics, the high stresses result in local yielding and not component failure.
Failure would occur if there was inadequate ductility due to too low a test temperature or incorrect heat treatment such that there was nill ductility, or if the component was not designed or fabricated correctly. The failure due to nill ductility is a rapid progression of the crack, and if it is massive component, can lead to serious injury to personnel who are directly under or alongside the vessel. It sounds bad, but could be much worse- if you were to pnuematically test the vessel and it failed with nill ductility the result can be an explosion and damage within a wide area of teh vessel.
RE: Hydrostatic test
Regards,
athomas236
RE: Hydrostatic test
RE: Hydrostatic test
Nothing has happened, vessel has been in servoce about 18 months I believe.
athomas236
RE: Hydrostatic test
Can you spend a few mins on this thread: Stress Relief Vs. PWHT http://www.eng-tips.com/viewthread.cfm?qid=146488 and let me know?
Thanks
RE: Hydrostatic test
my 2 pennies,
LV
RE: Hydrostatic test
UNder what Code was the construction,
I do not think ASME B&PV Code will allow it under any circunstances.
genb
RE: Hydrostatic test
Thanks to all who post,
LV
RE: Hydrostatic test
There are guidelines buried in the various codes, and also in our company proprietory standards for a temperature safety margin between MDMT and hydrotest water temperature.
This is to gaurd against brittle failure during hydro.
Depending on wall thickness, the margin could be as high as 17degC.