INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Offshore phase separator design & control

Offshore phase separator design & control

Offshore phase separator design & control

(OP)
Generally, two questions here:

(1)
Are there any more specific differences in designing a production separator for topside facility compared to those separators for the downstream activities?

(2)
How different is the control system implemented for upstream production separator compared to those separators at downstream (i.e. refinary)? Especially in terms of copping with the occurence of slug flow and fluctuations?

PhD - Permanent Head Damage

RE: Offshore phase separator design & control

The control systems onshore could benefit from following the offshore standards.  Offshore in the USA the instrumentation and controls must comply with API RP 14C, ANALYSIS, DESIGN, INSTALLATION, AND TESTING OF BASIC SURFACE SAFTEY SYSTEMS FOR OFFSHORE PRODUCTION PLATFORMS.

Independently of the regulatory measurement and controls, a high level trips the inlet.  A low level trips the outlet pumps.  In addition to the PSV there are high and low pressure trips and perhaps a temperature trip.  The check valves have instrument tag numbers, ...

You will likely provide a Safety Instrumented System per ISA 84.  A SAFE chart shows the causes, effects and the Safety Analysis Checklist item number. Lots more.

RE: Offshore phase separator design & control

The main differences that may affect the design of the actual separator is that space is often at a premium offshore, so some design compromises may have to be made: vertical separators etc (although having said that, in my experience, I've not seen a vertical spearator offshore!).  the other affect on floating hosts (FPSOs, TLPs Spars etc) is that the separator is moving: heave pitch and so on, so the internals may have to be modified slightly to allow for this.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources