INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

footings for future structures

footings for future structures

footings for future structures

(OP)
I am currently design a open building which is going to be closed in couple of years. the owner want us to design the footings which are for future walls and columns. I am wondering if there are ways or details for future dowels that can be buried under finish grade but not affect the functin of the open building?

RE: footings for future structures

I've used a weaker concrete to encase the future dowels... it's possible to box them out using pwf material and seal them to keep any moisture out... it may be just as easy to drill and epoxy new dwls when and if the work goes ahead...

Dik

RE: footings for future structures

(OP)
Thanks Dik. can you tell me more about the pwf? do you know a website about it? yeah I drill and epoxy is an option. but if I have a long wall, maybe it is easier to stick out a couple inch dowels and later on connect the bars in the wall with couplers. I don't know which way is better.

RE: footings for future structures

Depending upon the type of anchors you need, i.e. uplift versus just horizontal shear, I like the Simpson Titen HD anchors for just lateral forces.   I've personally installed them through wood sill plates into the existing footing, where the existing cast-in-place anchor bolts were outside of the sill plate!

Simpson has a report on their website.

RE: footings for future structures

pwf is lumber and plywood treated for use in preserved wood foundations... a notch above preservative treated.

I often use 25M (#8) bars at 32 or 48 o/c...  If you have a strip footing with a wall, then you can even cast a key into the existing footing... You should match the connectors with the actual load anticipated... often, other than bearing, this is quite small.

Dik

RE: footings for future structures

In the past we have greased and wrapped anchor bolts for future buried footings. It is also relatively easy to drill and grout in dowels in the future.

What is it that you are building now? What is the future construction?

RE: footings for future structures

(OP)
Thanks Steelylee

it could be concrete tie columns with reinforced CMU. it could be steel columns with reinforced CMU. We are contemplating now.

RE: footings for future structures

Might? want to consider the future construction as an expansion/movement joint while your at, depending upon the subsoil ie bedrock vs. clay, re settlement of future addition and the effect, if you connect it to ('connect2' hahaha, alright it's saturday afternoon, had a few brew so far) the original construction.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources