INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Determing Opening Wind Pressures

Determing Opening Wind Pressures

Determing Opening Wind Pressures

(OP)
Ah, another office debate! This is around determining the design wind pressures required for multi-component windows/doors.

Assume you have a 25 SH unit mulled together with a half-round top unit. Two cases:

1. If the manufacturer supplies a pre-engineered combined unit with a unit rated pressure, should the area used in determing the C&C design pressure be the gross area of the combined unit?

2. If the builder has to assemble the combined unit from 2 pieces, should each piece have its design pressure based on each pieces gross area (meaning two different design pressures as one pieces's area < 10 sft and the other > 10 sft)?

The same question applies to double and triple units. I maintain that unless the manufacturer produces such a unit, that the design pressures should be based on the indiviual areas of the pieces not the gross total opening area.

Comments are appreciated :)

RE: Determing Opening Wind Pressures

I agree with you.  Unless the 2 or 3 section unit is manufactured as one piece, I would use the smaller tributary thus giving a higher C&C design pressure.

Jordan

RE: Determing Opening Wind Pressures

egc,

My understanding is that your unit is two units whether it is assembled in the factory or in the field. The mullion uniting the units is loaded the same in either case.

In addition the 25 SH should be considerd as two areas since the meeting rails are loaded by both halves of the unit and act as a mullion does.

At least that is the way I do it in South Florida.

Dick

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources