INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

modeling Sewage Collection System

modeling Sewage Collection System

modeling Sewage Collection System

(OP)
All,

 What are the main benefits of modeling a sewer system with a backwater analysis? I know that this way you can locate hydraulic jump locations and exact water depths in each pipe segment but are there any other advantages? I can see the benefit of locating a hydraulic jump but isn’t an approximate water depth enough ?

if you run your model in term of pipe capacity only, just to make sure that each pipe can handle the peak flow at the constructed slope without exceeding the velocity limits (0.75m/s - 2.5m/s ) and ensuring a maximum depth of 70% "the client is rich and he is happy with this number" would that be enough ? do I still have to do a backwater analysis ?

The discharge points are always either an existing manhole or a pumping station wet well so tail water is not really encountered or very localized.

The reason I’m asking is that I’ve just obtained Sewercad of Haested method and it uses the backwater analysis method. I’ve worked before on excel sheet that only checked the pipe capacity.

Please try to answer my questions one by one.

Thanks all for your inputs.

RE: modeling Sewage Collection System

I'm really sorry to hear that you just bought SewerCAD.  If you try to model an extensive combined pressure gravity system you'll find it very frustrating.  I built a model of 40+ lift stations and 1000+ pipes and it was an awful experience. Single lines with one lift station discharging into a gravity system are okay (although if the controling point is not at the end of the line you have to make the rest of your forcemaing a gravity line with bolted manholes).

Just looking at the capacity of the pipe leaves out two bits: the inlet capacity and the upstream effects of a surcharged pipe in your gravity system.  If your system runs smoothly, you've nothing to worry about, but if you're trying to look for bypass points, you'll be able to pick up which manholes are overflowing, and in SewerCAD, you'll be able to color code them.

Also in SewerCAD you're able to do an extended period analysis to see where your bottleneck points are and if your lift stations will overflow if inflow exceeds maximum outflow for a certain period (for instance, during a 24-hour storm event).

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources