INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

leakage in water supply pipes

leakage in water supply pipes

leakage in water supply pipes

(OP)
Doing some work on water distribution networks and just wondering if there are any 'rules of thumb' regarding economical levels of leakage.  I know leakage can be expressed in %UFW, l/prop/hr and l/km/day, with each being more suitable for differenct types of network, e.g. urban vs. rural.  It would be useful to know what is generally considered a realistic target for leakage.

RE: leakage in water supply pipes

I think this could be a very hard question to answer with generalities as this can be a little more complex subject than perhaps publicly perceived.  "Unaccounted for" (in some areas perhaps synonymous with unmetered or billed?) water of course may or may not be "leakage" for perhaps many reasons (including apparently substantial metering errors reportedly found in some locales, water used for flushing/fire fighting or other uses etc. that for whatever reason is not run through an accurate meter, water "flat out" stolen etc.)  While these terms are no doubt sometimes used synonymously (in some cases perhaps rather accurately, but perhaps in others due to a lack of specific knowledge, or maybe even for political or various specific business promotional reasons), perhaps this should be kept in mind in talking about this subject.  

RE: leakage in water supply pipes

how about 1 cubic foot water per day per inch of inside diameter per mile of pipe?  this is a test requirement for new pipe that we we require at 1.5 times the design working pressure. More than this would be considered defective pipe.  

As far as economics, this depends upon your (additional) costs to acquire the water, treatment, storage, pumping etc. and should be compared to the annualized cost to repair the leaks.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources