INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Help with gradings in Land Development!!!!!!

Help with gradings in Land Development!!!!!!

Help with gradings in Land Development!!!!!!

(OP)
Hi, I need to know how to do a grading in a terrain digital model with a 0.50m increment.  I want to know if it is possible to put a first level and increase the next parcel 0.50m up from the first one.

RE: Help with gradings in Land Development!!!!!!

Please be more specific...

What are your intentions (e.g., Are you going to calculated the volume of that one parcel ? Are you trying to get design contours? Are you trying to compare two different volumes? I can probably answer your question if you will be more specific.  What's your intensions and do you have any
existing terrain data?

RE: Help with gradings in Land Development!!!!!!

(OP)
I'm trying to compare two different volumens, so I have to do a new surface with the final site grading that I want, I have an urban project and I have designed the roadways, drainage, stormwater and water distribution systems. Everything made digitally, using Land Development, Civil Survey and Civil Design.   I have to make the site grading for the project and there are a lot of lots, with different levels.  At present I put the level with 4 points by lot, but in this case there are too many and I want to know if is posible to mark an area and put a level, then  mark next area with the level reference from last one marked without create four new points with a new level each time for each lot.

RE: Help with gradings in Land Development!!!!!!

There are many methods for this process of dealing with this problem.

Brian

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources