INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Automatic Glycol make-up system for close loop system

Automatic Glycol make-up system for close loop system

Automatic Glycol make-up system for close loop system

(OP)
I am looking for piping connection/diagram describing operation of automatic glycol make-up for close loop glycol/chilled water system. Specially I would like to know how the initial fill up of the system occurs.

Thank you.

RE: Automatic Glycol make-up system for close loop system

This is a very common piping detail and available on purveyor's websites.

It is also available in ASHRAE Systems volume.

Glycol mix just takes the place of domestic water fill with a pump adding the pressure to fill the system. Pump will shut off when pressure stat reaches set-point.

Pressure is about 6 psig/floor (12' floor-to-floor) of building plus 5 psig extra for venting.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources