INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Small (22-foot Diameter) WWTP Clarifier Mech. Replacement

Small (22-foot Diameter) WWTP Clarifier Mech. Replacement

Small (22-foot Diameter) WWTP Clarifier Mech. Replacement

(OP)
I am in the process of preparing Contract Docs. for the replacement of two small WWTP clarifier mechanisms.  I would like to solicit input from any who have recently gone through this.  As retrofitting can reveal unpleasant surprizes.

Thanks

RE: Small (22-foot Diameter) WWTP Clarifier Mech. Replacement

Are you talking about the skimmer arms? And/or their drive motors?  Please define exactly what is being replaced.

Generally, though, this will be a rare moment of draw down, so make sure nothing else below the normal water surface needs replaced, or include it now.  In particular will be the weirs and troughs which carry the clarified water away.  I'd bet that, since the skimmers have reached end-of-life, the weirs and troughs have sever corrosion.

Even if they are still sound, point out that maybe the client might wish to have them replaced during this time, to avoid another shutdown later.

At least put in the specs to check the anchor bolts - which you normally can't see - and replace any substandard ones.  Make sure to define what is substandard.

Remember, amateurs built the ark...professionals built the Titanic. -Steve

RE: Small (22-foot Diameter) WWTP Clarifier Mech. Replacement

(OP)
All mechanical and metal fabrications assoc. with the original equipment are to be replaced. I hope to possibly salvage the bridges, and use them to support the new mechanisms. But the spec witll provide for new bridges with a deduct for utilizing the existing bridges. The weirs, scum baffel, et. al. are to be new.  I anticipate screeding in new grout on the tank bottoms, in the same manner as is typically effected with new installations.  

Thanks, Fred

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources