INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Can a feature be controlled by two different position callouts?

Can a feature be controlled by two different position callouts?

Can a feature be controlled by two different position callouts?

(OP)
I have one subassembly. It contains one welded rectangular frame boxe and one floor pan/bracket. For the welded frame, there are three holes on bottom surface of frame to be used to mound to floor pan and there are four holes on top face of frame which will be used as mounting hole for another bracket. The floor pan has five holes. Three small holes for welded frame and two large holes for locating pin of floor. For this sub-assembly, I have to set floor surface as datum A and two large holes on floor pan as B and C. I also set up another datum system for four holes on the top surface of frame. I choose top surface as datum D and two holes as E and F. Datum E has position tolerance to A,B and C.
Can I assign rest holes on top surface of frame two position tolerance callout (one respect to A,B and C and one respect to D,E,F)?
Can one hole or feature be controlled by two position tolerance back to different datum system such as A,B,C and D,E,F?  

RE: Can a feature be controlled by two different position callouts?

ye368,

   I am not sure what you are trying to do here.  Are you subcontracting the whole sub-assembly, or are you getting the parts fabricated and assembling it yourself?

   If you subcontract the assembly and you have no plans to interchange the parts, you should let the sub-contractor locate the three small holes in the bottom.  

   On the top, you can use a composite tolerance for your holes, meaning that your tolerance block has two sets of positional tolerances.  Take a look at Figure 5-19 in ASME Y14.5M-1994.

   You need to visualize your datums as fixturing points rather than as things to dimension from.  I would be reluctant to accept a completely different set of datums at the top.

   How about you specify your top surface as Datum_D and do the following composite positional tolerance?

   POS 2mm DIA A B C
   POS 0.5MM DIA D

   I think this would make sense in the ASME standard.

                     JHG

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources