INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Shutting and killing a well in phases

Shutting and killing a well in phases

Shutting and killing a well in phases

(OP)
Hi,

I don't understand how a well is shutted and killed. What is the "kill phase" diagram and can anyone explain to me?.

Any information lecture notes, graphs,material attached are appreciated.

Thanks

RE: Shutting and killing a well in phases

I suppose you are talking about a producing well. Gas wells you dont want to kill. I assume you are looking to do some downhole work on a producing well.  Maybe a hole full of heavy fluid,like a brine.

RE: Shutting and killing a well in phases

(OP)

Its about a producing well. If for instance a well has to be shutted due to e.g maintenance operations in the wellhead or failure downhole how the shutting and killing  process will take place. I understand that a heavy mud is used.

RE: Shutting and killing a well in phases

You have to have a hydrostatic column of fluid that exerts a higher pressure on the reservoir formation than the pore pressure in the reservoir.  So, for example, in the depleted reservoir I'm working on, with a pressure of approx. 3500psi at 8300ft TVD, the mud weight needed to be greater than the pore pressure is about 8.1ppg:-  3500/ 8300 = 0.4217psi/ft; 0.4217 /0.052 = 8.1ppg.  So seawater, at 8.7ppg will kill the well, if you can stop it flowing away into the reservoir.  In order to do this we use a perflo pill, (which is a trade name for sized CaCO3), to block the pores in the reservoir formation, similar to how a mud filter cake works, which can be easily removed when we want to bring the well back on.

You wouldn't used mud to kill a well you want to bring back on, as you will proabaly have problems getting the well to flow again- you'd use the various solids-free brines that are available at variuos weights up to 16ppg: NaCl, bromides, formates, whatever, with a pill to stop the brines flowing away into the reservoir.

If you're killing the well before plugging & abandoning it, you'd use mud, probably the mud you've been using to drill the well.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources