INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

India road design
2

India road design

India road design

(OP)
I've been asked to confirm a design for a road job in  southern India.  The design is for 1 million axles for a 15 year period.  Specification is for 200mm sub-base, then 250mm hydraulically bound material, topped with 60mm base hma and 40mm wearing course hma.  The sub-base cbr is 8.  Is this spec over the top or can someone come up with a non asphaltic alternative?  

RE: India road design

2
Is the 250mm hydraulically bound material identified as WMM or WBM?  Will the subbase be crushed stone or river gravel?  Lorries in India are notoriously and severly overloaded - your 1 million standard axles may end up effectively to be much much higher.

For a road of which I am aware - a National Highway - and upwards to well over a hundred million axle loads on the life span, 330 crushed stone subbase, 200mm crushed stone base and 210 total bituminous thickness (170 dense base macadam) and 40 wearing course (BC) - on a CBR requirement (light tamping - standard Proctor) of 6 for the underlying 500mm subgrade.

A few things to consider - the mix designs typically now use 4 to 6 percent air voids - used to be 3 to 5% -  but the compaction level required by the agency is 98% Marshall - about 2% higher than normal compaction for highways.  Contractors always wanted to exceed (and many times more than 100%) because if below 98%, they lost a portion of their bid rate.  If below 95% they lost it all in some cases.  Secondly, it is very hot and humid - flushing is a big big problem - try to use a polymer modified bitumen - rubber modified can also work - or specify a 30-40 penetration grade.  60-70 has a softening point in the order of 46 to 47 degrees and with April/May temps approaching 46 to 48 with humidity, well, . . .  They have not gone to performance grade which would require viscosity decrease for the penetration grades.  Top down cracking is also understood to be a problem that should be addressed although many don't yet recognize the mechanism at present.

Just some thoughts - and goooooooooddd luck.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources