Welders in Mines
Welders in Mines
(OP)
Hello all...
This one goes out to all you mine power systems....
Typically, we install welding feeders with crouse hinds welding receptacles. The circuit consists of a Series C 60A breaker and a startco gfgc relay (GC not used) feeding the Crouse Hinds receptacle enclosure made up of a fused disconnect and receptacle. All of this is usually installed on a central unit (not running cables anywhere... well except to the welder...).
Is this mandatory, or can we get rid of the fused disconnect and just have the breaker/relay feed the receptacle?
Regards,
TULUM
This one goes out to all you mine power systems....
Typically, we install welding feeders with crouse hinds welding receptacles. The circuit consists of a Series C 60A breaker and a startco gfgc relay (GC not used) feeding the Crouse Hinds receptacle enclosure made up of a fused disconnect and receptacle. All of this is usually installed on a central unit (not running cables anywhere... well except to the welder...).
Is this mandatory, or can we get rid of the fused disconnect and just have the breaker/relay feed the receptacle?
Regards,
TULUM