INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Statistics analysis of TML UT measurements

Statistics analysis of TML UT measurements

Statistics analysis of TML UT measurements

(OP)


The selection of our thickness measurement locations (TMLs) is established in accordance with the API 570 guidelines.

Critical Piping circuits are selected in accordance with RECOMMENDED PRACTICE 571 Damage Mechanisms Affecting Fixed Equipment in the Refining Industry and API RECOMMENDED PRACTICE 580 Risk-based Inspection.

After the base line survey and the first inspection we calculate a corrosion rate based on the TML minimum thickness found in the circuit. With this corrosion rate we define the next inspection survey to define inspection frequency and estimation of the remaining life. After de third inspection survey we are in conditions to define a short term and a long-term corrosion rate, inspection frequency and a more accurate remaining life.

My question is:

Are there any guidelines for the statistics analysis of TML UT measurements?

A piping circuit section should be replaced when a TML of that section reaches the minimum calculated thickness or it should be given a statistics analysis of all TMLs within the whole critical piping circuit to preview the corrosion trend and pipe length replacement?

Comments on this subject should be appreciated
Regards

Luis Marques

RE: Statistics analysis of TML UT measurements

It realy depends on the deterioration mode(s)predicted, the TML locations should be selected based on the expected damage as well as the technique(s) employed to monitor it.
I use both statistical and actual data, if your software system allows you to look at the data in variuos ways do so. TML data is indicative of the health of a system, verification of the damage mechanism is key understanding where and when to replace piping / equipment.   

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources