INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Deep Soil Mixing?

Deep Soil Mixing?

Deep Soil Mixing?

(OP)
Have a site in NM for a large retail center.

Historical research indicates that the site was once a quarry for concrete and we understand spoils were backfilled uncontrolled with little to no compactive effort.

Preliminary borings encountered about 25 to 33 +/- feet of loose to medium dense (N=> 5 to 15) silty gravel with sand. Wc about 3 to 5% (dry to moist).  In-situ dry density on the order of about 100 to 105 pcf.

Currently we are considering piers and acipp for deep foundations, but thought deep soil mixing may be an option.  Dynamic compaction is not a viable option due to adjacent structures.

My question is...for recommendations in a report, what details and specifics should we illustrate for deep soil mixing?  Or is the deep soil mixing proprietory?  I don't think it is, so what is usually placed in a report?  Specifications?  Depth I would assume?

Anyway, any help would be great.  Or questions?  Or another angle we haven't thought about.

RE: Deep Soil Mixing?

You can get some general information from ETL 1110-1-185,
"GUIDELINES ON GROUND IMPROVEMENTFOR STRUCTURES AND FACILITIES", which compares and discusses many types of ground improvement. You should be a be to web search a free download.

RE: Deep Soil Mixing?

For the consideration of deep soil mixing you should be talking to a speciality contractor to get some information about the process.

What is the stratigraphy to the backfilled quarry bottom. Is the 25 to 33 ft the fill and below is dense or hard material.

Have you examined the feasibility of precast prestressed concrete piles or open toe pipe piles.

Your cipp piles may be the best option.

RE: Deep Soil Mixing?

Check out Hayward Baker's website for info regarding soil mixing.

http://www.haywardbaker.com

I always thought deep soil mixing was mostly used for soft, cohesive soils.

Have you considered vibrocompaction?  You mention that there are nearby structures.  How far away are they?

Hayward Baker has test results in sand that indicate peak particle velocities of 0.2 in/sec at 7 feet away from the vibroflot.

We recently did some vibrations monitoring for a site where we had relatively old buildings within about 100 feet of the vibrocompaction location.  We monitored vibrations and had peak particle velocities of about 0.08 in/sec at 60 feet from the vibroflot.

RE: Deep Soil Mixing?

sounds like your project would be suitable for soil mixing. we would be happy to help in your evaluation of the site. our company specializes in shallow and deep soil mixing. you can visit our website at www.raitoinc.com

RE: Deep Soil Mixing?

Hi,
Generally you can apply DSM in such a texture. I have been engaged with fairly similar project though that was mostly the protection for a deep excavation in an  area having silty sand (saturated) texture. Steel H piles were also inserted into the DSM columns with waling and anchorages. DSM columns had the role of decreasing hydraulic gradient and also somemeans for anchorage system. However, generally it is feasible.
You have to consider vibro compaction method as well. Which of the methods are better? many factors contribute as well as the value engineering.
Regards

RE: Deep Soil Mixing?

I believe that Hayward Baker is working on a project right now in New Mexico doing seep soil mixing.  I would contact their Texas office and ask for information.

RE: Deep Soil Mixing?

(OP)
Thanks for all the responses.

And any sort of dynamic compacton is not feasible on this site.  Short story:  The owner of the property, a concrete manufacturer, decided against a reputable geotech company in the past.  So, structures to the north and east of this particular site, structures that are also located in the quarry, have experienced upwards of 4 to 6 inches of distress.  And one of the structures is a condominium complex. Safe to say he is considering different options now...and safe to say anything dynamic is toooo risky.

Again, thanks for everyones response.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources