INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Bond symbols on drawings.

Bond symbols on drawings.

Bond symbols on drawings.

(OP)
What symbols are used to identify the bonding process on assembly drawings. I've got a mesh in contact with a flat surface. The contact points are one inch by one inch, each requiring spot bonding.

A leader with direction to the notes?

Any help will be greatly appeciated. Thanks

tod.lewis@svtnsg.com

RE: Bond symbols on drawings.

Leader & symbols can be the same as for welding and brazing, with the process typically called out by the note, ideally referencing a seperate procedure.

RE: Bond symbols on drawings.

And much like a weld procedure, your bond procedure should specify things like:

Surface preparation
Temperature limits
Sequence
Primers
Amount and type of adhesive
Clamping
Cure time (UV intensity if using a UV cure product)

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources