INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Partial Data Reports

Partial Data Reports

Partial Data Reports

(OP)
For a vessel constructed to ASME Sec VIII Div 1, where a nozzle reinforcing pad will be made from a dished head, and that head will be made from two pieces of plate, welded together by the head vendor, is a PDR form necessary?  The repad will not be pressure retaining in itself, as it is vented, however, it seems it will still be subjected to stress( indirectly) induced by pressure? Am I thinking right here?

RE: Partial Data Reports

weldtek;
Yes, I believe you are thinking correctly per UG-120, Paragraph c).
Nozzle reinforcement in the form of a fabricated pad is a pressure vessel part that is subject to inspection requirements under ASME Section VIII, Div 1.

RE: Partial Data Reports

Hi,
Yess..U will have to make PDR.
Mihir5577

RE: Partial Data Reports

Assuming the head mfr has an ASME stamp!

RE: Partial Data Reports

For nozzle reinforcement pad PDR is not required. Assuming that it is not directly contact with the pressure media.
This non-pressure part attached to the pressure part.

RE: Partial Data Reports

pvesseleng: Be careful--this is still a "load bearing" item even if it is not used for containment. As a minimum it would need full ID for material.

If you used a portion of the head that had the weld in it I would like to see a PDR. If not,a MTR and material marking and tracking would be required.

RE: Partial Data Reports

A repad if requied by Code is pressure retaining, and would require a partial data report if supplied as a welded assembly.

RE: Partial Data Reports

deanc,
reinforcing pad has requirements per UG-36, UG-37, UG-0, G-41, U-42 for design, welding and material sake, also the welding of reinforcement pad requires soapsuds test.
but it doesnt require PDR.
Am I wrong?
regards

RE: Partial Data Reports

Any pressure retaining PV part will need a PDR, reinforcing pad is a retaining pressure part.
If the pad is for structurals the PDR is not required
genb

RE: Partial Data Reports

I concur with aclark, a PDR is required if supplied as a welded assembly, documentation per ASME I if supplied as material.
Regards,
RLS

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources